Welcome U Channel  Advanced Materials Technology (Shanghai) Co., Ltd

Home/Engineering services

Guangzhou-Foshan Section of Guangzhou-Foshan Rail Transit Project

Project Overview:

The second phase of the Pearl River Delta Intercity Rapid Rail Transit Project from Guangzhou to Foshan Section Kuiqi Rail Drain Well to the east section of Xincheng, the main line mileage is YCK-6-558.90~YCK0+024.017; the length of the line is about 6.677km, all of which are underground lines. Set up 4 stations, from south to north, Xincheng East Station, Dongping Station, Century Lotus Station, and Lanshi Station. The maximum distance between stations is 2.819km, which is the interval between Shijilian Station and Lanshi Station; the minimum distance between stations is about 1.388km. Between Xinchengdong Station and Dongping Station, the average distance between stations is about 1.880km. Among them, there is one transfer station, Dongping Station, which transfers to the planned Foshan Line 3, Guangfo Ring Line, and Guangfo Jiangzhu Intercity Line.


Construction site: Foshan

Construction scale: The total investment for the second phase of the Guangzhou-Foshan section of the Pearl River Delta Intercity Rapid Rail Transit project is approximately RMB 3.71 billion, and the cost of the bidding project is approximately RMB 94 million.


4.jpg


Products designed for this project